title: "Canfranc International Railway Station refurbishment into Canfranc Estación Hotel, Huesca, Spain; Opened Jan 2023 with 104 rooms"
sdDatePublished: "2026-07-29T11:06:00Z"
source: "https://www.sika.com/dms/getdocument.get/7f052b01-f513-44f9-8a7d-c71296ac84c1/glo-canfranc-train-station-hotel-spain.pdf"
topics:
  - name: "construction and property"
    identifier: "medtop:20000235"
  - name: "tourism and leisure industry"
    identifier: "medtop:20000331"
  - name: "monument and heritage site"
    identifier: "medtop:20000044"
  - name: "hotel and accommodation"
    identifier: "medtop:20000333"
  - name: "restoration"
    identifier: "medtop:20000242"
locations:
  - "Canfranc"
---


Canfranc International Railway Station refurbishment into Canfranc Estación Hotel, Huesca, Spain; Opened Jan 2023 with 104 rooms

saw_Canfranc Estación Hotel, Spain

SIKA AT WORK
FROM TRAIN ­STATION
TO HOTEL, HUESCA, SPAIN
CONCRETE REPAIR: Sika MonoTop®, SikaRep®, Sika AnchorFix®, SikaGrout®
JOINT SEALING: Sikadur Combiflex® SG
WATERPROOFING: Sikalastic®
STRUCTURAL STRENGTHENING: SikaWrap®
PROTECTION: Sikagard®, SikaColor®
TILE SETTING: SikaCeram®

SIKA AT WORK
FROM CANFRANC TRAIN STATION TO CANFRANC ESTACIÓN HOTEL, HUESCA, SPAIN
2
PROJECT DESCRIPTION
The project features refurbishment and adaptive reuse of
the historic Canfranc International Railway Station (inaugu-
rated 1928) into a 5-star hotel while preserving the heritage
facade and architectural identity. The station was a major
cross-border hub in the early 20th century and is listed as an
asset of cultural interest (monument). Its transformation has
become a regional anchor for tourism and employment, at-
tracting international media attention. The total project size
is 9,210.66 m².
The building (≈241 × 12 m) is a symmetrical, elongated struc-
ture of concrete, iron, stone, glass, and slate at ~1,194 m
elevation in the Aragonese Pyrenees.
The project was executed in two phases:
Phase I (March 2019 – September 2020): restoration for public
use of perimeter platforms and vestibule. Investment €4.74 m
(excl. Vat).
Phase II (July 2021 – January 2023): refurbishment of the
station building for hotel use (royal hideaway, barceló hotel
group). Investment €11.40 m (excl. Vat).
The hotel was completed and opened in January 2023 with 104
rooms and multiple f&b venues, including “canfranc express”
housed in a restored carriage and awarded 1 Michelin star.
PROJECT REQUIREMENTS
Structural preservation & durability at altitude
	́ Reinforced-concrete facades, cornices, pillars, beams, slabs
from the 1915–1928 era exhibited gravel nests, localized
delamination, carbonation-induced rebar corrosion, and
cracking (including around canopy fixings).
	́ Harsh mountain climate (freeze–thaw, limited non-frost
working window ~March – October) dictated rapid-setting
solutions and robust protection systems.
Heritage constraints
	́ Facade, profiles, colors and textures to be restored “as-
original”; new work to be visually discreet (e.g., hidden crack
stapling, non-intrusive strengthening).
	́ Expansion joints (8–10 cm, overlapped to be visually conce-
aled) required sealing and fire sectorization without altering
the front views.
Change of use & load paths
New vertical communications (stairs/elevators) and room
program required local strengthening (columns, beams around
shafts; stairwells) while keeping the lobby open to full height
and respecting the dome/tower accents.
Execution constraints
	́ Works staged over winters; underside bridge deck repairs
required ultra-rapid mortars and anchored build-ups to
manage thickness and temperature.
	́ Continuous platforms and canopies on differential found-
ations demanded movement-tolerant sealing and flexible
waterproofing around interfaces.
SIKA SOLUTIONS
Assessment & preparation
	́ Water-jet cleaning to remove contaminants and weak
material; selective scarification around pathology and rust-
stained zones.
	́ Rebar treatment: exposed steel brushed and passivated
with Sika MonoTop®-910 S; two-coat Sika® Ferrogard®-903
Plus applied (saturation/pressure-spray) as a penetrant
corrosion inhibitor and primer before coatings.
­REVITALIZING OLD STRUCTURES
FOR NEW PURPOSES
Transform the historic Canfranc International Railway Station to a five-star hotel

SIKA AT WORK
FROM CANFRANC TRAIN STATION TO CANFRANC ESTACIÓN HOTEL, HUESCA, SPAIN
3
Concrete repair & reprofiling
	́ Gravel nests, honeycombing, and lost volumes reprofiled
with SikaRep®-2400; voids/backfills with SikaGrout®-340.
	́ Underside bridge deck and winter-window areas: successive
coats of Sika MonoTop®-3130 Ultra Rapid to achieve build-
up and early strength in low-temperature conditions.
	́ General repair mortars: Sika MonoTop®-3120 Rapid and Sika
MonoTop®-412 S deployed according to layer thickness and
exposure.
Crack repair & movement accommodation
	́ Structural crack stapling: U-shaped perforations with M12
steel staples bonded using Sika AnchorFix®-3030 and fully
embedded for invisible finish.
	́ Movement/control joints & sectorization: Sikadur®
Combiflex® system (≈250 lm) for high-movement sealing
around expansion joints and critical interfaces.
Structural strengthening
	́ Columns and local elements strengthened with
SikaWrap®-230 C CFRP wraps to recover/upgrade capacities
where reinforcement had deteriorated or load paths chan-
ged (e.g., stair cores, shaft perimeters).
	́ Beams around openings: localized CFRP reinforcement
to control deflection and shear where new openings were
introduced.
Waterproofing & facade protection
	́ Mineral waterproofing at sensitive exterior details with
Sikalastic®-1K.
	́ Facade coating system: Sikagard®-711 ES (intermediate)
with SikaColor®-671 W as the final acrylic topcoat in the
original heritage color, delivering UV stability and CO2 resis-
tance while matching the historic appearance.
Tile setting
	́ SikaCeram®-260 Superflex used in localized bedding/tiling
scopes consistent with the interior program.
	́ On-site specification & QA. The applicator Ainur Trabajos
Verticales, S.L. executed a meticulous, stepwise methodo-
logy (clean–remove–passivate–inhibit–repair–strengthen–
seal–coat), often exceeding the minimum brief (e.g., full-
face reprofile with SikaRep®-2400 for quality/finish).

PROJECT PARTICIPANTS
Owner: Suelo y Vivienda de Aragón, S.L.
(Gov. of Aragón — Dept. of Territorial Development, Mobility & Housing)
Architect: Ingennus Urban Consulting
(project adapted to operator, technical, and regulatory requirements)
Facades refurbishment contractor: Estudios Métodos Restauración
Interiors, access building, north access bridge refurbishment
 contractor: Ainur Trabajos Verticales, S.L. (specialist applicator)
Sika Organization: Sika Spain
© SIKA SERVICES AG / REFURBISHMENT / 04.2026
FROM CANFRANC TRAIN STATION
TO CANFRANC ESTACIÓN HOTEL
SIKA SERVICES AG
Tueffenwies 16
CH-8048 Zurich
Switzerland
Contact
Phone +41 58 436 40 40
www.sika.com
Any product name or reference reflects the Sika product name at the time of
creation of this document and may differ from the product name or reference
during past events.
Our most current General Sales Conditions shall apply. Please consult the most